In GTD, a project is anything that needs more than one action to complete. That definition is deliberately low, and it surprises people: booking a holiday is a project, so is renewing the car insurance, so is replying properly to a difficult email if you have to look something up first. A task, by contrast, is a single physical action you can do in one go.
Why set the bar so low?
Because the failure mode GTD is guarding against is a multi-step commitment sitting on a list disguised as a single task. Renew car insurance looks like one line. It is actually find the renewal date, gather the current details, get comparison quotes, decide, then buy – five separate things, several requiring information you do not have to hand.
When it sits on the list as one item, you look at it, absorb the fact that it is not doable right now, and move on. That happens every day for a month, and each pass costs a small amount of attention while producing nothing.
How should projects be named?
As outcomes, in the past tense or as a finished state. New insurance policy in place beats car insurance. Kitchen tap replaced and working beats tap.
The reason is that an outcome tells you when you are done, and a topic never does. It also makes it obvious whether an item is finished during the weekly review, which is otherwise a surprisingly slow judgement to make across thirty projects.
What is the one rule the project list has to follow?
Every project needs a next action defined somewhere. This is the entire mechanism, and it is the thing the weekly review is checking for.
A project without a next action is invisible during the week. It never appears on a list you work from, so no matter how important it is, nothing happens. Work does not usually stall because someone decided to stop; it stalls because a next step was never named.
Should future steps go on the list?
Usually not. One next action per project is enough, because doing it frequently changes what the following step should be. Loading five speculative steps makes the list longer and often wrong.
Where you have genuine sequencing to think through, keep it in project notes rather than on the action list. The list is for things you can do now; the plan is reference material you consult when the current step finishes.
The exception is parallel work. If three things can genuinely happen at once – chasing three quotes, say – all three belong on the list.
How many projects is too many?
Most people run between thirty and a hundred once personal commitments are included, which is higher than expected and not in itself a problem. The number that matters is how many are actively moving.
If your weekly review keeps turning up the same twenty projects with no progress, they are not projects, they are intentions. Moving them to someday maybe is not defeat; it makes the active list an honest description of what you are actually doing, which is the only thing that makes it worth reviewing.
What is the practical benefit of separating the two?
Two lists that each do one job. The project list answers what am I committed to, and is read weekly. The next actions list answers what can I do now, and is read daily.
Merged into one list, neither question gets answered. You end up with a document containing both undoable outcomes and doable steps, which is uncomfortable to read for exactly the reason it is uncomfortable to work from: half of it is not actionable and the other half is buried.
This is why people who keep a single long to-do list often describe it as guilt-inducing. The feeling is accurate rather than irrational. A list you cannot act on most of is not a plan, it is a record of everything you have not finished, and reading it delivers exactly that message every time.